Tlicho All Season Road - EA-1617-01

Document List

Displaying 301 documents.
1.75 MB

The transcript for day one of public hearing in Whati held on Wednesday November 15, 2017.

5.19 MB

The Review Board is posting the Report of Environmental Assessment and Reasons for Decisions for Fortune Minerals NICO project, EA0809-004. During the public hearing parties referenced this report. The Review Board canvassed parties and the developer and there were no objections to posting this report to the public registry.

6.26 MB

The Review Board is posting the Report of Environmental Assessment and Reasons for Decision for the Dominion Diamond Ekati Corp. Jay Project, EA1314-01. During the public hearing parties referenced this report. The Review Board canvassed parties and the developer and there were no objections to posting this report to the public registry.

100.05 KB

During the public hearing the Tlicho Government requested that the results from a 2011 survey of Whati residents views on the road be posted to the public registry.

2.66 MB

During the public hearing the Tlicho Government requested a report about construction camps be posted to the public registry. The Review Board asked parties if they had any concerns and parties indicated they did not.

289.75 KB

During the public hearing the Tlicho Government requested that the results of a 2006 poll about the residents of Whati views on an all season road be posted to the registry. The Review Board asked parties if they had any concerns with this new evidence and parties indicated they didn't have any.

4.15 MB

Tlicho Government submission of their 2013-2017 Strategic Framework document, "In Tlicho Unity: A strategic framework and intentions 2013-2017. Submitted as supporting evidence from the Public Hearing.

158.92 KB

Tlicho Government Land Use Guidelines, 2015. Submitted as a homework piece during the Whati Public Hearings (Day 1).

301.17 KB

The CV for Daniel Coulton.

113.16 KB

Notice of proceeding describing the requirement for parties and the developer to submit qualifications of any expert witnesses they rely on.

770.83 KB

This document provides direction to media representatives who wish to attend the public hearings.

156.04 KB

Meeting report between GNWT and ECCC on baseline data for avian species at risk.

1.2 MB

GNWT's presentation for day 1 of the public hearing.

831.86 KB

The Developer's day 2 public hearing presentation.

980.62 KB

The Developer's presentation for day 3 of the public hearing.

504.81 KB

Proper spelling for common Tłı̨chǫ place names and a link to a Tłı̨chǫ dictionary. Presenters at the Public Hearing are asked to review their presentations for proper spelling of Tłı̨chǫ terms.

323.83 KB

ECCC presentation on Water

707.99 KB

ECCC public hearing presentation on wildlife

31.27 KB

The NPMO's cover letter for public hearing presentations.

584.89 KB

NRCAN's public hearing presentation

192.61 KB

NRCAN's summary of its public hearing presentation.

1.68 MB

The NSMA's public hearing presentation

4.39 MB

The TG's public hearing presentation for day 1.

1.15 MB

The TG's public hearing presentation for day 2.

1.42 MB

The TG's public hearing presentation for day 3.

1.04 MB

The YKDFN's public hearing presentation.

489.01 KB

The agenda for the public hearings in Whatì on November 15, 16 and 17.

3.25 MB

The WRRB's public hearing presentation for day 2.

1.87 MB

The WRRB's public hearing presentation for day 3.

606.09 KB

Meeting minutes from the EA1617-01 TASR Pre-hearing Conference meeting. The meeting took place October 25, 2017 at the Review Board office in Yellowknife.

1.38 MB

The Developer's response to the WRRB's technical report on boreal woodland caribou.

15.97 MB

The developer's updated consultation and engagement package.

1.93 MB

A submission by the WRRB of a Federal government document on the the status of the implementation of the boreal caribou recovery strategy

34.65 KB

The Review Board requested the developer's provide its position on the participation of Board member James Wah-Shee in the public hearings.This document is the developer's response.

4.77 MB

Information about the Inuvik to Tuktoyaktuk highway working group.

204.05 KB

A table showing the status of commitments from the technical session.

2.93 MB

The developer's response to parties' technical reports.

1.9 MB

The developer committed at the technical session (commitment 7) to take elders on a site visit of the TASR alignment to visit proposed culvert locations. This document is a summary of this visit.

1.38 MB

Reference document for parties on how boreal caribou 65% threshold was derived, and opportunities to understand disturbance and population response. "Understanding disturbance thresholds and opportunities to achieve better outcomes for boreal caribou in Canada: a primer". Published by the Canadian Boreal Forest Agreement.

42.34 KB

GNWT letter to the YKDFN acknowledging receipt of YKDFN's concerns as outlined in their technical report submission to the Review Board, and encouragement for continued participation and dialogue.

385.7 KB

Agenda for the TASR Pre-hearing conference. The conference will be held at the Review Board office in Yellowknife, from 10am-12pm on Wednesday, October 25, 2017. Teleconference is available.

469.58 KB

Draft agenda for EA1617-01, Tlicho All-season Road. The Draft agenda has been put together to facilitate discussions at the Pre-hearing Conference (see PR#231) on October 25, 2017. A final agenda will be posted closer to the Public Hearing date that considers feedback from the Developer and parties.

938.24 KB

Pre-hearing conference slides for October 25, 2017.

111.81 KB

Note to file describing James Wah-Shee's participation in the Tlicho All Season Road project public hearings in Whati, November 15-17, 2017.

796.26 KB

WRRB technical submission specific to boreal woodland caribou.

56.96 KB

Letter from the Canadian Northern Economic Development Agency outlining the participation and status of Government of Canada departments for EA1617-01.

5.91 MB

Per commitment 7 and 14 made during the technical session the developer took DFO representatives and a local harvester to visit water course crossings where culverts are proposed along the proposed TASR alignment.

128.44 KB

Letter from the GNWT Department of Environment and Natural Resources to the Department of Infrastructure informing that a Wildlife Act Section 95(1) determination has been made and that a Wildlife Management and Monitoring Plan (WMMP) will be required for the TASR prior to construction.

1.7 MB

The North Slave Metis Alliance's technical report.

4.78 MB

The WRRB's technical report

1.36 MB

The Tlicho Government's technical report

592.81 KB

The Yellowknife Dene First Nation's technical report.

906.24 KB

Environment and Climate Change Canada's technical report

10.25 MB

A document referenced in ECCC's technical report.

6.62 MB

A document referenced in ECCC's technical report.

788.73 KB

Fisheries and Ocieans Canada's technical report.

104.33 KB

Natural Resources Canada's technical report.

33.04 KB

A cover letter for the Government of Canada's technical reports.

345.18 KB

Review Board will hold a pre-hearing conference on October 25 at the Review Board's office from 10am - 12pm. Items to discuss include the public hearing agenda, format, presentations and expectations. Teleconferencing will be available. See form for more details.

170.05 KB

Meeting notes from Oct 3 WMMP meeting

1.19 MB

The WRRB's response to commitment number 11 from the technical session which asekd for the WRRB to identify special boreal caribou habitat in the vicinity of the proposed road.

312.89 KB

The GNWT's response to the September 8th fisheries and wildlife questions from the WRRB.

2.89 MB

The developer has stated that the TASR will require an explosives permit from NRCAN. This document contains additional details on explosive use and management for the TASR and an example of an exposives management.

3.23 MB

The Developer's meeting report for the Wildlife Management and Monitoring Plan overview meeting.

16.48 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 1 of 9 - main report.

10.68 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 2 of 9 - appendices a-d.

19.2 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 3 of 9 - appendix e part 1.

25.05 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 4 of 9 - appendix e part 2.

58.27 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 5 of 9 - appendix e part 3.

50.62 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 6 of 9 - appendix e part 4.

29.84 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 8 of 9 - appendix e part 6.

37.91 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 7 of 9 - appendix e part 5.

10.46 MB

Draft geotechnical investigation of granular and bedrock prospects for the Tlicho All Season Road. Document split into eight parts due to size (PR#200-PR#208). Part 9 of 9 - appendices f-h.

2.15 MB

Additional boreal caribou maps and narrative for figures in the GNWT response to ECCC IR#7. Provided in response to commitment 9 from the technical session.

21.11 MB

Bathurst caribou range plan interim discussion documents, submitted to the Review Board registry by the GNWT at the request of WRRB.

6.7 MB

Species status report on the porcupine caribou and barren-ground caribou in the NWT, submitted to the Review Board registry by GNWT at the request of WRRB.

143.8 KB

The Government of Northwest Territories provided a note along with the submission of the Cluff et al. 2017 unpublished draft report (PR#195 and #196) that GNWT referenced in its response to commitment 3 (PR#189, #190).

903.05 KB

Unpublished draft of 'Calf production and adult sex ratio in the bathurst and bluenose east herds of barren-ground caribou' report by Cluff et al. 2017. Referenced by GNWT in its response to commitment 3 (PR#189, #190). An accompanying note from GNWT can be found in PR#194 and the appendices are in PR#196.

4.35 MB

Appendices to go with PR#195.

180.5 KB

Summary of relevant findings from archaeological work completed at 13 potential borrow pits. Provided in response to commitment 22 from the August technical sessons in Behchoko.

434.95 KB

Government of Northwest Territories cover letter for the September 22 submission of the updated draft Wildlife Management and Monitoring Plan.

4.51 MB

Government of Northwest territories updated draft Wildlife Management and Monitoring Plan, September 2017.

165.52 KB

GNWTs response to technical session commitment 3 about caribout distribution. Associated maps can be found in PR#190.

5.88 MB

Caribou distribution data maps associated with PR#189 (response to technical session commitment 3).

106.29 KB

Meeting report between the GNWT and WRRB to discuss the WRRBs request for extension for their Technical report. Meeting occurred September 11, 2017.

95.31 KB

A meeting report for a meeting between Government of Northwest Territories, Natural Resources Canada, and the Northern Projects Management Office related to the storage and use of explosive for EA1617-01.

337.63 KB

Natural Resources Canada guidelines for bulk explosives facilities minimum requirements, February 2014.

1.47 MB

Government of Canada explosives regulations, 2013.

846.67 KB

Presentation for the technical report preparation meeting on September 14, 2017.

199.71 KB

Note to file on the technical report preparation meeting, which will be held at the Review Board office at 10:30am on Thursday, September 14, 2017. Includes tips for preparing a technical report.

136.83 KB

Operating procedures for collared caribou and geotechnical investigations along the proposed TASR. Response to part of commitment 10 from the technical session. The rest of the response to commitment 10 will be provided in the updated WMMP.

885.92 KB

EA1617-01 Tlicho All-season Road: Final Response to North Slave Metis Alliance's July 14, 2017 Information Requests.

1.03 MB

This is the developer's response to ECCC IR#9 which asked the developer to consider recent data collected by ECCC on birds along highway 3.

215.64 KB

Questions from the WRRB to the developer regarding fish, wildlife and Tlicho Knowledge.

5.54 MB

A document submitted by the WRRB regardign boreal caribou habitat and habitat use in the Wek’èezhìi.

7.68 MB

A document submitted by the WRRB on Boreal caribou habitat and disturbance in the Wek’èezhìi from 2013

67.21 MB

A document submitted by the WRRB.

30.2 KB

The North Slave Metis Alliance's party status application form.

212.04 KB

This notice of proceeding outlines the next steps in the EA process.  This includes a pre-techinical report meeting, a pre-hearing conference, a community hearing, and technical hearings.

397.51 KB

The Review Board met with the WRRB to discuss technical reports and public hearing process steps.

2.56 MB

Provided by the developer as part of teh response to commitment 15.

1.13 MB

The final list of commitments from the techinical session including a marked up version showing were changes were made and package of emails showing that parties agree to the wording.

39.31 KB

A completed application form for Party status from the Yellowknives Dene First Nation.

154.86 KB

A letter from the WRRB requesting an extension for submitting its technical report.

63.37 MB

Geotechnical report from the 2017 winter geotechnical program.

162.63 KB

A letter from the Wek’èezhìi  Renewable Resources Board regarding the review of the updated Wildlife Management and Migitation Plan.

228.55 KB

The updated work plan, including dates for technical reports and the public hearing.

87.37 KB

A meeting report between the GNWT and WRRB regarding follow-up on wording of commitment #3 from the technical session.

986.83 KB

A letter from the developer regarding the review of the WMMP and timing considerations for the EA workplan.

1.43 MB

"Memorandum of Understanding between the CGW, TG, TCSA and RCMP: A Regional Engagement Process and Partnership to develop a shared plan to target the root social causes leading to harm of society and individuals themselves." Submitted from Technical session as example of ongoing works and collaborations to address social issues in Whati.

2.6 MB

This file contains the developer's presentations for day 1, 2, and 3 of the technical sessions. 

1.61 MB

The transcript for day three of the technical session held on Thursday August 17, 2017 in Behchoko.

1.87 MB

The transcript for day 1 of the technical session held on Tuesday August 15, 2017 in Behchoko.

1.56 MB

The transcript for day two of the technical session held on Wednesday August 16, 2017 in Behchoko.

326.82 KB

An introductory presentation for the techinical session provided by the Review Board on day one, Tuesday August 16, 2017.  

562.6 KB

Developer responses to NSMA information requests.

37.58 KB

The cover letter for the developer's responses to the North Slave Metis Alliance's information requests.

165.1 KB

The CV for Cameron Stevens, consultant for the developer. 

475.69 KB

The WRRB submitted the document, Action Plan for the Woodland Caribou (Rangifer tarandus caribou), Boreal Population, in Canada, Federal Actions 2017.

10.16 MB

The WRRB submitted the document, Population dynamics and critical habitat of woodland caribou in the Saskatchewan Boreal Shield, interim report 2013-2016, Department of Biology University of Saskatchewan.

694.28 KB

The developer's draft WEMP submitted for the technical sessions.

349.01 KB

Pre-Techinical Session Conference Minutes

159.87 KB

An amended response for the WRRB IR1 submitted on July 14, 2017 public registry number 142.

246.81 KB

The Review Board is hosting a pre-technical session conference on August 1, 2017.

839.86 KB

The developer's resonponses to MVEIRB information requests 10, 11, 12, 15 and 21.

445.28 KB

The developer's response to the WRRB's information requests 4, 5 and 12.

42.68 KB

The developer's cover letter for information responses to NRCan IR#6. MVEIRB IR# 10, 11, 12, 15, and 21. WRRB IR# 4, 5, and 12.

13.77 MB

The developer's response to NRCan information request 6.

923.29 KB

A compilation of the first round of information requests and responses from the online review system.

210.65 KB

A letter from the Review Board clarrifying how the NSMA's information requests will be considered.

604.27 KB

The developer's responses to WRRB information requests 1, 2, 7, 9, 10, 11, and 13.

589.86 KB

The developer's responses to Review Board information requests 3, 16, 17, and 19.

734.11 KB

The developer's responses to ECCC information requests 6, 8, and 9.

51.93 KB

The developer's cover letter for information request responses from ECCC IRs 6, 8, and 9. MVEIRB IRs 3, 16, 17, and 19. WRRB IRs 1, 2, 7, 9, 10, 11, and 13.

790.92 KB

The North Slave Metis Alliance's review of the developer's Adequacy Statement Response.

259.19 KB

Technical sessions are scheduled for August 15th and 16th in Behchoko.

188.67 KB

The developer's responses to the WRRB's information requests 3, 6 and 8.

447.89 KB

The developer's cover letter for information responses to ECCC's 5 and 10, MVEIRB's 1, 2, 4, and 6, and the WRRB's 3,6, and 8.

297.06 KB

The developer's responses to the Review Board's information requests 1, 2, 4, and 6.

266.28 KB

The developer's responses to ECCC's information requests 5 and 10.

350.03 KB

A meeting report between the developer and ECCC regarding ECCC's information request #9 concerning migratory birds.

4.11 MB

The developer's response to ECCC information requests 1, 2, 3, 4 7, 11, and 12.

176.78 KB

A letter from the developer to the Review Board regarding information response submission dates.

36.96 MB

The developer's resonse to Natural Resources Canada information requests including attachments.

145.02 KB

Information request respones from Fisheries and Oceans Canada to MVEIRB IR#5 and Environment and Climate Change Canada to the Wek'eezhii Renewable Resources Board IR #14.

794.93 KB

The Tli?cho Government's response to information requests from MVEIRB: IR#9, IR#13, IR#18, and IR#20. And from the North Slave Metis Alliance: IR#2, IR#3, and IR#4.

204.53 KB

The developer's response to the North Slave Metis Alliance information requests number one and three.

57.5 KB

The developer's cover letter for information request responses for ECCC IRS 1,2, 3, 4,7, 11 and 12. And NRCAN IRS 1-7. And Review Board IRs 8 and 14. And NSMA IRs 1 and 3.

5.91 MB

Three letters between the developer and YKDFN regarding YKDFN concerns about potential project related impacts. File is bookmarked for letters and attachments.

31.13 KB

A letter from the Northern Projects Management Office to the Northwest Territories Metis Nation regarding participation in the EA.

643.42 KB

This is a summary of a May 25, 2017 technical review session held by the developer. Attendees included the Yellowknives Dene First Nation and the WRRB.

1.75 MB

On May 17, 2017 the developer hosted a technical review session of the Adequacy Statement Response. This document contains the meeting minutes and the developer's presentation.

128.45 KB

A letter from the Tlicho Government to the Review Board regarding the first round of information requests. The Tlicho Government has no information requests.

353.25 KB

The WRRB requested an extension for submitting its first round of information requests untill June 2, 2017. The Review Board grants this extension.

563.21 KB

A letter from the GNWT to the NSMA granting funding for a traditional knowledge study related to the Tlicho All-Season Road Environmental Assessment.

333.63 KB

This is an updated concordance table for the Developer's Adequacy Statement Response.

341.33 KB

This is a cover letter for the updated concordance letter.

171.69 KB

This notice of procedding provides direction on the first round of information requests.

224.24 KB

Updated workplan including dates for the next phase of EA.

114.86 KB

This is the Review Board's letter to the developer regarding the conformity determination of the Adequacy Statement Response.

33.95 MB

This is the Developer's Adequacy Statement Response.

490.75 KB

FIsh and fish habitat

101.29 KB

Identifies the Tlicho Government's party status for EA1617-01.

1.51 MB

Action and planning tools to assist authorities in the conservation and recovery of boreal caribou in the Northwest Territories.

177.95 KB

Summary discussion of boreal caribou issues related to the proposed Tlicho All-season Road

72.47 KB

To assist the Board and parties in the assessment of barren-ground caribou

105.84 KB

An assessment of the COSEWIC status of barren-ground caribou and other species.

477.81 KB

WRRB response to GNWT regarding November 10, 2016 meeting discussing Boreal caribou population health. Comments on MVEIRB adequacy statement request; NT range population; meeting minutes & commitments

165.75 KB

Notes and follow-up from GNWT November 10, 2016 meeting with ECCC, WRRB and CANNOR regarding TASR Adequacy Statement 4.1 - Boreal Caribou - Population Health

1.48 MB

Response to the Review Board's October 28, 2016 Information request responses to the Tlicho Government and Community Government of What.

6.16 MB

NSMA Appendices to PR#98 with index. Tab 2: Letter from Canada to NSMA (16.08.2013); Tab 3: Letter from NSMA to Canada and GNWT (10.02.2014); Tab 4: Correspondence btwn NSMA and GNWT re caribou.

201.65 MB

NSMA Appendices to PR#98 with index. Tab 1: Documents filed with Supreme Court of NWT for Enge v. Mandeville, 2013 NWTSC 33. Refer to PR#98 for sections relevant to EA1617-01.

337.69 KB

Letter from the Tlicho Government outlining the depth and strength of research,d etail and analyis taken in response to the October 28, 2016 Board information requests.

381.59 KB

ECCC review of meeting notes and follow-up items from November 22nd, 2016, meeting with GNWT. Discussion on boreal caribou population trends and absence of range plan for North Slave region.

2 MB

Tlicho Government response to Review Board October 28, 2016 information request responses to Aboriginal Government Organizations and Resource Managers.

674.32 KB

NSMA response to Review Board's Oct. 28 Information Requests.

46.34 KB

Nothern Project Management Office provides an information request response regarding fish harvesting within the scope of the TASR project

1.86 MB

1997 DFO report by D.B. Stewart: "A review of the status and harvests of fish stocks in the North Slave area, Northwest Territories". Submitted by WRRB for Oct. 28 IR response.

414.2 KB

Response by WRRB to Review Board's Oct. 28 Information Request regarding potential aboriginal fisheries in the vicintiy of the all-season road and their potential impact from project activities.

159.76 KB

Review Board staff response to PR#85 confirming discussion points from a December 2nd, 2016 meeting with GNWT staff reviewing instructions on the GNWT's Adequacy Statement Response.

147.29 KB

GNWT and Review Board staff meeting with GNWT consultants Dec 2, 2016, to clarify items from the Terms of Reference and Adequacy Statement and ensure intent is understood when preparing the response.

1.99 MB

Updated response time on the GNWT's written preliminary assessment of NSMA members' Aboriginal rights claim in the NWT - new timeline for early 2017.

559.16 KB

Letter from GNWT to Review Board seeking clarification on EA1617-01 requirements from the ToR and AS based on a staff meeting held December 2, 2016.

113.39 KB

Complete party status application form from the WRRB to the Review Board for EA1617-01, the Tlicho All-season Road.

113.58 KB

Review Board proceeding in response to a request for extension regarding the information requests issued by the Review Board on October 28, 2016.

52.47 KB

Letter from NSMA to MVRB requesting additional time to prepare responses to information requests.

38.86 KB

NSMA letter to GNWT (copied to Review Board). Regarding: North Slave Metis Alliance - Preliminary Assessment of Strength of Claim. GNWT written submission anticipated by NSMA in mid-December.

173.28 KB

MVEIRB Note to File to Distribution List inviting organizations and individuals interested in EA1617-01 to apply for party status with the Review Board. December 21, 2016 application deadline.

1.81 MB

Draft Recovery strategy for the Boreal Caribou (Rangifer tarandus caribou) in the NWT (June 3, 2016). Submitted by the GNWT in response to Adequacy Review ORS comments (PR#76 WRRB#2).

300.77 KB

This is an updated ORS comment table including errata,

2.07 MB

Mackenzie Bison Management Plan - Draft Version 7. Submitted by the GNWT in response to Adequacy Review ORS comments (PR#76 WRRB#2). Plan developed by the Mackenzie Bison Working Group, July 2016.

109.3 KB

WRRB email to MVEIRB - clarification that GNWT-ENR has latest version of draft Bison Management Plan and not WRRB. MVEIRB recommended to contact GNWT-ENR for copy.

520.62 KB

Microsft Word table from the Online Review System, with public and proponent comments, proponent responses and Review Board responses re. the draft Terms of Reference and draft Adequacy Statement.

199.25 KB

The Review Board's draft Work Plan for the Tlicho All-season Road Project

587.95 KB

The Review Board's final Terms of Reference for the Tlicho All-season Road Project

385.99 KB

This is the Reasons for Decision for the scope of environmental assessment and adequacy statement for the Tlicho All-season Road.

160.46 KB

This document clontains information requests from thye Review Board to Aboriginal Groups.

163.85 KB

Notice of Proceeding - Issuance of Review Board's Terms of Reference, Adequacy Statement and supporting documents for the Tlicho All-season Road Project

218.32 KB

This document contains information requests to Tlicho Government and Community Government of Whati.

390.49 KB

The Review Board's final Adequacy Statement on outstanding information needs to saitsfy the ToR for the Tlicho All-season Road Project, EA1617-01 (version 2: corrected reference links in section 4).

487.46 KB

This notice of proceeding informs parties and the public of Board member Yvonne Doolittle's recusal from participation in the TASR EA and all EA project files where the GNWT is a proponent

105.6 KB

A flyover video of the Tlicho All-season road, flown September 1 2016, is available for viewing on the Tlicho Government website at tlicho.ca/all-season-road

1.12 MB

Letter from GNWT to NSMA providing an update on GNWT's preliminary assessment of NSMA members' asserted Aboriginal rights claim in the NWT, intention to meet, and encouragement of TASR participation.

46.52 KB

The Government of Northwest Territories- Department of Transportation submission from the Financial Administration Manual defining forced growth.

549.1 KB

A memorandum letter from Fisheries and Oceans reviewing the review and approval of water crossing projects under the Fisheries Act.

1.37 MB

A chain of correspondence about engagement. consultation and concerns not specific to the Tlicho All-season Road

763.23 KB

Protocol for the Review of Water Crossings Proposed Through the Forest Management Planning Process

51.68 KB

Letter from the Government of Northwest Territories - Department of Transporation outlining their reponse package to comments from parties on the draft Terms of Reference and draft Adequacy Statement

936.69 KB

GNWT letter response to Deh Gah Got'ie First Nation regarding their assertion of Rights and interests in the TASR project area. The letter encourages and provides instructions on EA participation.

164.19 KB

GNWT email response to Deh Gah Got'ie First Nation Oct. 7 email asserting rights and interests in the TASR project area. Referenced letter attchment has been added as a separate public registry item.

131.69 KB

Email from Chief Joachim Bonnetrouge to GNWT asserting section 35 Rights and Treaty 11 interests in the region of the TASR project, and expression of support for a full enviornmental assessment.

187.64 KB

Communication between Board staff, Yellowknifves Dene First Nation and the developer regarding a request for late comments be accepted to the public registry, 1 day after the due date.

595.12 KB

Letter from GNWT to the respective Chiefs in the Deh Cho region informing them of the TASR project and the GNWT's duty to consult for any s.35 Rights that might be affected by the Project.

56.92 KB

Letter to Review Board outlining NSMA's views on the draft Terms of Reference and draft Adequacy document for the TASR EA.

107.5 KB

Notification of an updated video submitted by the GNWT of the proposed TASR alignment, taken September 1, 2016. Instructions on how to view the video are included.

4.6 MB

GNWT consultation letters notifying Aboriginal groups of EA1617-01, the Tlicho All-Season Road, and request for identification of any asserted Aboriginal rights affected by the project.

134.21 KB

Note to File summarizing a meeting with GNWT-DoT, Board Staff, and representatives from the Tlicho Governmen, October 7, 2016. The meeting purpose was to clarify aspects of the Adequacy Statement.

63.55 KB

Letter from NSMA requesting a meeting a meeting with the GNWT to discuss their members' Aboriginal rights as Metis with respect to the proposed Tlicho All-season Road and the Draft Recreational Land Management Framework.

78.36 KB

GNWT email to NSMA confirming receipt of their October 7, 2016, letter, with GNWT's intent to respond in the coming week.

46.08 KB

GNWT letter describing an updated flyover video of the TASR alignment, flown September 1, 2016. The purpose of the video is to illustrate the disturbance and use along the alignment.

200.3 KB

Review Board responsibilities under section 127.1 of the MVRMA, in response to the August 17, 2016 letter from the Tlicho Government (PR#13).

347.68 KB

Review instructions for the draft Terms of Reference and the draft Adequacy Statement. Public comments are due October 13, 2016. Comments from the developer are due October 20, 2016.

1.01 MB

EA1617-01 TASR draft Terms of Reference for public review, as per Step 3 of the September 19, 2016 Notice of Proceeding (PR#44) for the Review Board's approach to the Terms of Reference.

369.98 KB

EA1617-01 TASR draft Adequacy Statement for public review, as per Step 3 of the September 19, 2016 Notice of Proceeding (PR#44) (formatting corrected)

463.28 KB

Notice of proceeding advising the developer and interested parties of the next steps in developing a terms of reference and work plan for the TASR Project

158.59 KB

This reference document provides a single point of contact for links to the developers Project Description Report and Appendices in order as they appear in the hard copy.

8.34 MB

Presentation from the 2016 Inter-agency meeting updating the progress of commitments to programs and plans regarding preparation for a proposed all-season road.

155.94 KB

Community Government of Whati's strategic planning details including steps for implementation of strategies

647.15 KB

Summary of the May 2016 Inter-agency Meeting that followed up on implementation plans for the Tlicho All-season Road

105.31 KB

Acknowledgement of receipt of a notification pursuant to SS. 79(1) of the Species at Risk Act

531.89 KB

Reminder to submit documents according to the Board's Document Submission Standards. This will help all parties and the developer review information in a more consistent and efficient manner.

903.75 KB

This is a summary of the issues scoping meeting in Yellowknife August 24, 2016.

120.24 KB

A flight video is available for viewing at the Review Board office or GNWT-DOT office. A solution to view the videos online is being developed and an update will be provided once finalized.

405.91 KB

Response from ECCC to MVEIRB from a question during the technical scoping session (Aug 24, 2016) on why 40 years is the accepted amount of time following a fire for caribou habitat to return.

217.12 KB

Review Board letter to GNWT regarding crown consultation with the NSMA during the TASR EA

36.33 KB

This document contains a LOCATION UPDATE for the Yellowknife Scoping Session taking place on August 24, 2016.

1.25 MB

Summary report from the Tlicho All-season Road community scoping session in Whati.

2.64 MB

PowerPoint presentation delivered by the Mackenzie Valley Environmental Impact Review Board at the community scoping session in Whati.

2.32 MB

PowerPoint presentation delivered by the Government of Northwest Territories at the community scoping session in Whati.

347.91 KB

This letter clarifies the Tlicho Government's participation in the TASR environmental assessment

134.19 KB

Several letters from NPMO to aboriginal groups encouraging participation in the TASR environmental assessment

688.47 KB

This is a letter from GNWT advising MVRB on how the GNWT departments will participate during the TASR EA.

413.77 KB

Review Board staff met with GNWT-Department of Transportation staff to introduce a new staff member and provide a brief EA update.

714.98 KB

Request for interested parties to subscribe to the EA1617-01 TASR email distribution list, with instructions on how to do so.

360.87 KB

This notice of proceeding announces a community issues scoping meeting in Whati August 18 and a techcnial issues scoping meeting in Yellowknife August 24.

180.62 KB

This is the notification letter regarding referral of the Tlicho All Season Road to environmental assessment.

360.15 KB

This document is the Review Board's Reasons for Decision to self-refer the Tlicho All Season Road Project to environmental assessment.

89.38 KB

Developer's covering letter for WLWB application.

276.05 KB

Wek'eezhii Land and Water Board draft land use permit and terms and conditions for the Tlicho All-season Road.

208.55 KB

Completed WLWB application form.

40.72 KB

Appendix A to the Project Description Report. Joint letter to acknowledge access through an agreement between the Tlicho Government and the Government of the Northwest Territories.

56.09 KB

Tlicho Government and Community Government of Whati Commitments.

589.46 KB

An economic cost benefit analysis quantifying community and industry costs and benefits associated with the Tlicho All-season Road project.

1.51 MB

Introduction to Appendix E of the Project Description Report, including affected parties, engagement goals and methods, engagement plan, and engagement summary and log templates.

4 MB

Scoping study of potential social, economic and cultural benefits and risks of a proposed all-weather road in the community of Whati.

8.27 MB

This document contains preliminary screening material from the WLWB and is a compilation of the ORS table of comments and responses as well as attached documents from reviewers and the developer..

112.2 KB

A letter from Tlicho Grand Chief Eddie Erasmus to the Minister of DOT regarding collaboration with DOT on preparing studies for an application for an all-season road

7.39 MB

TASR figures including road alignment, road cross section, alternative routes, borrow areas, surficial geology. soils, ecozones, burn areas and land uses.

63.78 KB

Description of water sampling procedure at SNP sites.

6.92 MB

A map and route plan and profile (by route section) prepared by DOT of the proposed all-season road to Whati

12.49 MB

Powerpoint photo presentation of existing conditions along the proposed all-season road route

3.02 MB

Conceptual designs of the major bridge and culverts along the all-season road, prepared by GNWT-DOT

829.1 KB

Draft Waste Management Plan (WMP)

10.98 MB

All-season road alignment map and images prepared by Kavik-Stantec for GNWT-DOT

10.61 MB

Erosion and sediment control manual (GNWT-DOT)

126.89 KB

Email correspondance confirming that the community of Whati will permit refuse from construction camps in the Whati landfill

1.49 MB

Draft Wildlife and Wildlife Habitat Protection Plan

1.33 MB

Draft Quarry operations plan, prepared by GNWT-DOT

57.77 KB

Table characterizing granular and bedrock features (with recommendations for future work) by section along the all-season road

1.47 MB

Draft Spill Contingency Plan

6.5 MB

Micro-economic analysis of the all-season road prepared by the Community Government of Whati in 2015

13.08 MB

Archaeological impact assessment (AIA) prepared by Stantec for GNWT-DOT in 2014

1.56 MB

Draft fish and fish habitat protection plan (FFHPP)

553.48 KB

Draft emergency response plan (ERP) for construction of the all-season road, prepared by the GNWT

1.44 MB

Field survey photos from argo trip along the proposed all-season route in June 2014, including summary table and cooridinates of observations

637.4 KB

DFO fisheries protection self-assessment record, prepared by GNWT-DOT

6.86 MB

Hydrological study progress report prepared by Stantec for the GNWT-DOT

54.43 MB

Hydrologic and hydraulic study prepared by Stantec for GNWT-DOT

1.61 MB

Archaeological site chance find protocol (GNWT-DOT)

276.4 KB

Log of engagement activitied undertaken by the GNWT - DoT.

105.84 MB

Engagement summaries, archival information and other engagement records referenced in the Project Description Report.

5.97 MB

Traditional Knowledge study for the proposed Whati all-season road, prepared by the Tlicho Government in 2014