NICO Project - EA0809-004 [2009]
4 MBNICO Scoping Session Presentation - Project Description
This is the NICO project description presentation delivered by Fortune Minerals Limited at the communtiy scoping session held in Wekweeti on Nov. 2 and 3, 2009. An updated map shows the combined tailings-mine rock disposal area. This a corrected version of the project description presentation that was previously posted to the registry on December 9.
| Received: | Dec 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 91 |
2 MBNICO Scoping Session Presentation - Environmental Overview
This is the NICO environmental overview presentation delivered by Fortune Minerals Limited at the communtiy scoping session held in Wekweeti on Nov. 2 and 3, 2009. An updated map shows the combined tailings-mine rock disposal area.
| Received: | Dec 9, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 90 |
0.1 MBScoping Session Wekweeti - NICO Project
This is a summary of the Review Board's scoping session in Wekweeti, November 2-3, 2009. Issues were documented by Review Board staff during the meeting.
| Received: | Nov 10, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 84 |
0.09 MBWekweeti sign-in sheet
This is the sign-in sheet from the community scoping session held in Wekweeti on November 2-3, 2009 for the NICO Project environmental assessment.
| Received: | Nov 10, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 85 |
0.02 MBFortune Minerals Ltd. NICO Project Environmental Assessment - Note to File 002
Note to File for the environmental assessment of Fortune Minerals Ltd.'s NICO cobalt-gold-copper-bismuth project that summarizes an October 26, 2009 meeting between Review Board staff and a Fortune Minerals Ltd. representative regarding the draft workplan for the environmental assessment.
| Received: | Oct 27, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 76 |
0.07 MBFortune Minerals Ltd. NICO Project Scoping Agenda - Wekweeti
This letter notifies the Distribution List that the Review Board will hold a scoping session in Wekweeti on November 2nd and 3rd for the environmental assessment of Fortune Minerals Ltd.'s proposed NICO cobalt-gold-copper-bismuth project.
| Received: | Oct 27, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 77 |
0.09 MBLetter from Developer re: Processing Plant Changes at NICO site
An update on processing changes at the NICO Site for the Fortune Minerals Limited Cobalt-Gold-Bismuth-Copper Project.
| Received: | Sep 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 61 |
0.06 MBLetter from Developer re: Processing Plant Changes-Appendix I
Appendix I - Details on processing changes at the NICO site for the Fortune Minerals Limited Cobalt-Gold-Bismuth-Copper project.
| Received: | Sep 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 62 |
0.5 MBMapsheet 1
Mapsheet 1 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (2 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 47 |
0.5 MBMapsheet 10
Mapsheet 10 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (11 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 56 |
0.4 MBMapsheet 11
Mapsheet 11 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (12 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 57 |
0.5 MBMapsheet 12
Mapsheet 12 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (13 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 58 |
0.7 MBMapsheet 13
Mapsheet 13 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (14 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 59 |
0.5 MBMapsheet 14
Mapsheet 14 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (15 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 60 |
0.5 MBMapsheet 2
Mapsheet 2 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (3 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 48 |
0.5 MBMapsheet 3
Mapsheet 3 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (4 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 49 |
0.4 MBMapsheet 4
Mapsheet 4 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (5 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 50 |
0.5 MBMapsheet 5
Mapsheet 5 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (6 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 51 |
0.7 MBMapsheet 6
Mapsheet 6 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (7 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 52 |
0.7 MBMapsheet 7
Mapsheet 7 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (8 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 53 |
0.6 MBMapsheet 8
Mapsheet 8 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (9 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 54 |
0.5 MBMapsheet 9
Mapsheet 9 attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (10 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 55 |
0.7 MBMapsheet Overview
Overview map attachment to August 6, 2009 letter from Fortune Minerals regarding Nico transportation route. (1 of 15 documents)
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 46 |
0.09 MBResponse from Fortune re: Transportation Route
This is the repsonse from Fortune Minerals to the Review Board's June 30th letter. It describes maps showing the transportation route to be followed by trucks carrying concentrate from the proposed Nico mine site in the Tlicho region. Note that the 13 maps and map overview sheet received with this letter are saved as seperate files on this web page.
| Received: | Aug 11, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 45 |
0.05 MBFortune Press Release re: southern processing
This is a press release from Fortune Minerals stating that the processing plant for the Nico Project will be located at a southern site outside of the NWT. The release also provides a rationale for Fortune's decision.
| Received: | Jul 27, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 44 |
0.2 MBLetter from Tlicho re: road route
This is a letter from Arktis Solutions on behalf of the Tlicho Government regarding the status of the potential GNWT road in the Tlicho, which would be used for transportation of concentrate from the Nico minesite to Highway 3.
| Received: | Jul 23, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 43 |
0.2 MBLetter to Fortune re: transportation route details
This letter from the Review Board to Fortune Minerals Ltd. requests details regarding the proposed route for transporting concentrate from the NICO Project mine site to the highway.
| Received: | Jun 30, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 42 |
0.1 MBNICO Scoping Issues- Gameti Session (May 7 '09)
This is a summary of the issues raised at the Review Board's scoping session in Gameti on May 7th, 2009. Issues have been documented from the cards filled out and posted during the session.
| Received: | Jun 19, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 40 |
2 MBLetter from Fortune- Location of Processing Plant
This letter, from Fortune Minerals Ltd., confirms its decision to ship concentrates from the proposed NICO Project mine site in the Tlicho to a facility in southern Canada. This is a response to the May 26, 2009 letter from the Review Board.
| Received: | Jun 17, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 39 |
0.1 MBIssues Identified in NICO Scoping- Behchoko session
This is a summary of the issues raised at the Review Board's scoping session in Bechoko on May 4th, 2009. Issues have been documented from the cards filled out and posted during the session.
| Received: | Jun 10, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 37 |
0.2 MBENR scoping comments- NICO Project
This letter describes the GNWT Department of Environment and Natural Resources' scoping comments regarding Fortune Minerals Ltd.'s proposed NICO Project in the Tlicho region.
| Received: | Jun 1, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 38 |
2 MBFortune's Response to Questions Raised in Scoping
This is a letter from Fortune Minerals to address questions raised by participants at scoping sessions for the environmental assessment of the proposed NICO Project.
| Received: | Jun 1, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 30 |
0.7 MBNSMA Scoping Comments- NICO Project
This letter describes the North Slave Metis Alliance's scoping comments regarding Fortune Minerals Ltd.'s proposed NICO Project in the Tlicho region. (It includes an attachment in the same PDF file)
| Received: | Jun 1, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 35 |
0.4 MBTlicho Govt Scoping Comments- NICO Project
This letter was submitted on behalf of the Tlicho Government. It describes scoping comments regarding Fortune Minerals Ltd.'s proposed NICO Project in the Tlicho region.
| Received: | Jun 1, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 34 |
0.1 MBWRRB Scoping Comments- NICO Project
This letter describes the Wekeezhii Renewable Resources Board's scoping comments regarding Fortune Minerals Ltd.'s proposed NICO Project in the Tlicho region.
| Received: | Jun 1, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 36 |
0.2 MBMVEIRB Letter to Fortune re: Processing Plant Location
This letter from the Review Board to Fortune Minerals Ltd. requests the location of the proposed NICO Project processing plant.
| Received: | May 26, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 29 |
0.4 MBEcology North scoping comments - NICO Project
This letter describes scoping comments from Ecology North regarding the Fortune Minerals Ltd. proposed NICO Project. Information in the document was used during preparation of the Terms of Reference but had not been posted to the public registry originally due to technical difficulties.
| Received: | May 15, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 112 |
0.4 MBINAC Scoping Comments- NICO Project
This letter describes INAC's scoping comments regarding Fortune Minerals Ltd.'s proposed NICO Project in the Tlicho region.
| Received: | May 15, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 31 |
0.1 MBDFO Scoping Comments- NICO Project
This letter describes the Department of Fisheries and Ocean's scoping comments regarding Fortune Minerals Ltd.'s proposed NICO Project in the Tlicho region.
| Received: | May 14, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 32 |
0.1 MBNRCan Scoping Comments- NICO Project
This letter describes Natural Resources Canada's scoping comments regarding Fortune Minerals Ltd.'s proposed NICO Project in the Tlicho region.
| Received: | May 14, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Parties/Public |
| Public Registry: | 33 |
0.03 MBScoping Submission Deadline Extension for Fortune Minerals NICO Project Environmental Assessment - Note to File 001
This document notifies parties on the distribution list for the environmental assessment of Fortune Minerals' NICO Project that the deadline for submitting scoping comments has been extended until June 1st, 2009.
| Received: | May 14, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 28 |
0.5 MBDeveloper's Response to Request for Clarification
This is the response of Fortune Minerals Ltd. to the Review Board's May 1st, 2009 request for clarification regarding certain aspects of the proposed NICO Project.
| Received: | May 13, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 27 |
0.04 MBIssues Identified in NICO Scoping- Yellowknife Session
This is a list of the points raised during the technical scoping session held in Yellowknife on April 20th, 2009, for the NICO environmental assessment.
| Received: | May 13, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 21 |
0.06 MBNICO EA Scoping- Sign-In Yellowknife Session
This is the sign-in sheet from the technical scoping session held in Yellowknife on April 20th, 2009, for the NICO environmental assessment.
| Received: | May 13, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 22 |
0.09 MBNICO Scoping Issues- Whati Session (April 27 '09)
This is a summary of the issues raised at the Review Board's scoping session in Whati on April 27th, 2009. Issues have been documented from the cards filled out and posted during the session.
| Received: | May 13, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 41 |
0.06 MBWhati Scoping Session Sign-In
This is the sign-in sheet from the technical scoping session held in Whati on April 27th, 2009, for the NICO environmental assessment.
| Received: | May 13, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 26 |
4 MBNICO Environmental Overview Community Presentation
This is the NICO project environmental overview presentation delivered by Fortune Minerals Ltd. at the communtiy scoping session held in Whati on April 27th, 2009. Similar presentations were made in Bechoko (May 4th, 2009) and Gameti (May 7th, 2009) scoping sessions.
| Received: | May 3, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 24 |
5 MBNICO Project Overview- Community Scoping Sessions
This is the NICO project description presentation delivered by Fortune Minerals Ltd. at the communtiy scoping session held in Whati on April 27th, 2009. Similar presentations were made in Bechoko (May 4th, 2009) and Gameti (May 7th, 2009) scoping sessions.
| Received: | May 3, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 23 |
0.09 MBRequest for Clarification- NICO EA, May 1 2009
This letter from the Review Board to Fortune Minerals Ltd. requests clarification regarding roads and processing options for the NICO Proect.
| Received: | May 1, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 20 |
2 MBNICO Environmental Overview presentation- April 20 09
This is the NICO environmental overview presentation delivered by Fortune Minerals Ltd.from the technical scoping session held in Yellowkife on April 20th, 2009.
| Received: | Apr 23, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 19 |
5 MBNICO Project Description Presentation
This is the NICO project description presentation delivered by Fortune Minerals Ltd.from the technical scoping session held in Yellowkife on April 20th, 2009.
| Received: | Apr 23, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 18 |
0.03 MBNICO Scoping Brochure- YK Session April 20 2009
This is a brochure and agenda for the technical scoping session on Fortune Mineral Ltd.'s NICO Project. It includes an agenda for the scoping session in Yellowknife on April 20th, 2009.
| Received: | Apr 16, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 17 |
0.07 MBNico Community Scoping Schedule Letter - UPDATE
This letter contains REVISED dates for Fortune Minerals Ltd.'s NICO Project issues scoping sessions. The scoping sessions will take place in Yellowknife, Behchoko, Whati and Gameti. The environmental assessment of this proposed cobalt-gold-bismuth mine is in the scoping phase.
| Received: | Apr 15, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 16 |
0.07 MBNICO Issues Scoping Sessions Scheduling Letter
This letter notifies the distribution list that the Review Board has scheduled scoping sessions for the environmental assessment of Fortune Minerals Ltd.'s Cobalt-Gold-Bismuth NICO Project. This letter contains the dates and locations for such sessions.
| Received: | Apr 9, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 15 |
0.2 MBNICO Project Summary April 2 09
This is a summary description of the NICO Project, a gold, cobalt and bismuth mine proposed by Fortune Minerals in the TliCho region. (Figures are posted as seperate documents)
| Received: | Apr 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 9 |
2 MBNICO Project Summary- Figure 1- Project Study Area
This is Figure 1 from the summary description of the NICO Project. It shows the project study area.
| Received: | Apr 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 10 |
0.4 MBNICO Project Summary- Figure 2- Drainage Areas
This is Figure 2 from the summary description of the NICO Project. It shows the drainage areas around the project site.
| Received: | Apr 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 11 |
3 MBNICO Project Summary- Figure 3- Topo and Exploration Facilities
This is Figure 3 from the summary description of the NICO Project. It shows topography and exploration program facilities.
| Received: | Apr 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 12 |
4 MBNICO Project Summary- Figure 4- Site Development
This is Figure 4 of the summary description of the NICO Project. It shows the proposed development at the project site.
| Received: | Apr 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 13 |
2 MBNICO Project Summary- Figure 5- Roads
This is Figure 5 of the summary description of the NICO Project. It shows existing and proposed roads.
| Received: | Apr 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Developer |
| Public Registry: | 14 |
0.3 MBNICO Scoping Letter- April 2 09
This letter describes upcoming scoping activities by the Review Board, These activities will help the Review Board identify the issues that the envirnmental assessment of the proposed NICO Project should focus on.
| Received: | Apr 2, 2009 |
|---|---|
| Document Date: | Unknown |
| Originator: | Review Board |
| Public Registry: | 8 |
Total Number of Documents: 61